Selected
Build-To-Suit Projects
TOYOTA MATERIAL HANDLING occupied their new 43,983
square foot Hayward
regional headquarters/distribution facility in March 2000.
This facility featured 22’ clear height and an office area of
approximately 10,000 square feet on two floors.
FEDERAL EXPRESS
occupied their new 106,722 square foot San Jose distribution
facility in June 1997. This
state-of-the-art package distribution facility was designed with 18’
clear height and land for additional expansion.
10,000 square feet of customer service and administrative office
were included in the new building.
At the time, this facility was Federal Express’ largest package
distribution center in the Bay Area.
CREATIVE LABS
occupied their new 177,005 square foot Fremont distribution
facility in September 1996.
This facility features 30’ clear height, 20 dock doors and a parking
ration of approximately 5 cars/1000 sq. ft.
14,000 square feet of two-story administrative office was
constructed in the building.
This facility was the national distribution center for Creative’s line
of Soundblaster and other well-known PC products.
PUBLISHERS GROUP WEST
occupied their new 211,000 square foot Hayward distribution
facility in January 1993. The
building has 24’ minimum clear height with a sprinkler rating of .45
GPM/3,000 sq. ft. There are 40
dock high doors and 6 grade level doors.
An office area of approximately 4,600 square feet was also
constructed. Publishers Group
West utilizes this facility for storage and distribution of books and
publications, along with administrative offices.
MARKO FOAM PRODUCTS, INC. moved into 72,900 square
feet of a new 98,965 square foot building in
Hayward
in September 1994. This building
provides 22’ minimum clear height, a sprinkler rating of .45/GPM/3,000 sq.
ft., 18 dock high doors and 10 grade level doors.
Marko operates a state-of-the-art polystyrene molding facility at
this location.